Method and system for laying pipe through the use of a plow

   
   

A method and system for laying and burying pipe a seabed using a pipe trenching plow that is advanced along the seabed to form a continuous trench. The pipe trenching plow cuts a pilot hole in the seabed using a cutting apparatus and widens and forms a trench from the pilot hole using expandable spreading side sections. A pipe guiding sled also is used to support and guide the pipe into the trench and a trench box section retains the trench geometry as the pipe trenching plow is continuously advanced in a forward direction. The pipe trenching plow cutting the trench and burying the pipe with minimal turbidity and seabed disturbance.

Une méthode et un système pour poser et enterrer la pipe un fond de la mer à l'aide d'une charrue de défoncement de pipe qui est avancée le long du fond de la mer pour former un fossé continu. La charrue de défoncement de pipe coupe un trou pilote dans le fond de la mer à l'aide d'un appareillage de découpage et élargit et forme un fossé du trou pilote en utilisant les sections latérales de propagation extensibles. Un traîneau de guidage de pipe également est utilisé pour soutenir et guider la pipe dans le fossé et une section de boîte de fossé maintient la géométrie de fossé pendant que la charrue de défoncement de pipe est sans interruption avancée dans une direction vers l'avant. La charrue de défoncement de pipe coupant le fossé et enterrant la pipe avec la perturbation minimale de turbidité et de fond de la mer.

 
Web www.patentalert.com

< Concrete module for retaining wall and improved retaining wall

< Water flow responsive barrier for gutters and storm drains with rotary actuator

> Marine buoyancy modules and units

> Grout injecting/structure anchoring system

~ 00144