A method for determining an optimal inspection schedule for a structure is described. The method includes determining a crack size distribution table for the structure, determining a plurality of risk values, each risk value for a different estimated usage hours of the structure and based on said crack size distribution table, estimating a first inspection interval based on a predetermined risk value threshold, and determining a second inspection interval based on analyzing the rate of increase of risk value and probability of detection of a crack in said first inspection interval.

 
Web www.patentalert.com

< METHOD FOR DETERMINING A CRITICAL REDUCTION IN SHAFT SPEED IN A WORK MACHINE

> System and method for embedding search capability in digital images

> VIRTUAL WHITE LINES FOR DELIMITING PLANNED EXCAVATION SITES

~ 00544