A method for repairing in-ground tunnel structure involves applying a first curable resin over a cementitious liner which lines the interior wall surfaces of the tunnel, drilling drainage holes in the cementitious liner, and filling the drainage holes with a second curable resin. The resins are allowed to cure and harden. The cured resins seal the wall surfaces and drainage holes to provide a composite tunnel structure having high mechanical strength and resistance to fluid leaks.

 
Web www.patentalert.com

< Method of forming a mat of erosion control blocks

< In-situ process for detoxifying hexavalent chromium in soil and groundwater

> Method for salvaging offshore jackets

> Attachment element

~ 00215