The invention is a method for lifting and transporting a heavy load by using a heavy lift vessel with at least two heavy lift cranes adapted to operate simultaneously; mounting fly-jibs on the heavy lift crane to increase reach and height of the heavy lift crane; picking up a load from a first location using the fly-jib modules simultaneously; shifting the load from the first location to over a second location on the heavy lift vessel; placing the load on the second location; moving the heavy lift vessel to a second position; using a mooring system to maintain the heavy lift vessel at the second position; picking up the load from the second location using the fly-jib modules simultaneously; shifting the load from a second location to over a third location; and placing the load on the third location.

 
Web www.patentalert.com

< Method and device for drilling a hole and for securing an anchorage in a bore hole

< Method for offloading and storage of liquefied compressed natural gas

> Permanent and semi-permanent groyne structures and method for shoreline and land mass reclamation

> Permeable water reservoir covers

~ 00201