Method for installing a duct (2) in the ground, whereby a longitudinal element (1) is already present in the ground near the route along which the duct (2) is to be installed, whereby the existing longitudinal element (1) is used as a guide for the duct (2) to be installed and the duct (2) is pushed into the ground with the aid of a fluid under pressure fed through the duct (2), whereby the duct (2) to be installed is coupled to the existing longitudinal element (1) by at least one divisible coupling piece (3) and whereby the coupling element is advanced along the existing longitudinal element (1) The invention also provides a coupling piece (3) for guiding the duct (2) along the longitudinal element (1).

Método para instalar un conducto (2) en la tierra, por el que un elemento longitudinal (1) esté ya presente en el cercano de tierra la ruta a lo largo de la cual el conducto (2) debe ser instalado, por el que se utilice el elemento longitudinal existente (1) mientras que una guía para el conducto (2) que se instalarán y el conducto (2) se empuja en la tierra con la ayuda de un líquido debajo de la alimentación a presión a través del conducto (2), por el que el conducto (2) que se instalará sea juntado al elemento longitudinal existente (1) por por lo menos un pedazo divisible del acoplador (3) y por el que el elemento del acoplador esté avanzado a lo largo del elemento longitudinal existente (1) la invención también proporciona un pedazo del acoplador (3) para dirigir el conducto (2) a lo largo del elemento longitudinal (1).

 
Web www.patentalert.com

< Composite masonry block

< Method of forming enlarged pile heads

> Foundation support and process for structures

> Headwall for drain pipe

~ 00089